Meeting Biodiversity Net Gain (BNG) requirements on Northern Gateway’s complex, multi-authority development

Arboriculture BNG Ecology Landscape

Northern Gateway is a large, commercial-led project situated on allocated land in Greater Manchester. It hasa planning application boundary of 209.8 hectares within a wider allocation of around 600 hectares.

The goal of this development is to deliver a nationally important employment space through the development of commercial and distribution centre warehouse units that will create up to 600,000 square metres of employment floor space. One of the key project challenges for Ecology, Landscape and Arb is mitigating the loss of Biodiversity Net Gain (BNG).

Navigating scale, time and regulations

Complexity of stakeholders

The project is led by the Northern Gateway Development Vehicle (NGDV), which is a joint venture between two major land developers, Russell LDP and Harworth Group. The site spans two separate local councils in Greater Manchester (Rochdale and Bury). That means two separate local planning authorities (LPAs) as well as the two developers, collaborating with our ecologists, arboriculturists and landscape architects. Add to that all the other disciplines within the wider project team, such as heritage, drainage, and so on. That’s a lot of moving parts.

A worst-case scenario

We initially assessed the outline application on a worst-case BNG scenario. In simple terms, we assumed the majority of the site would be developed; other than areas of retained habitats, of particular note, the Whittle Brook Corridor.

That assumption led to a significant projected drop in the site’s net BNG. However, it was a deliberate and justified approach. By testing the scheme under the most demanding scenario, we’ve built in maximum flexibility for future developers. That flexibility will be essential for delivering a commercial scheme that is likely to come forward in phases over a long period.

Nick Bell, our Senior Ecology Consultant, explains how: “It’s unusual because we’ve assessed it on a worst-case basis, assuming a much larger development footprint than what will ultimately be built out. It was essential that for the outline application, maximum flexibility for the size, location and orientation of the units was assessed. Knowing that as the scheme progresses through planning, and further detail comes forward, BNG can be refined and the overall BNG deficit reduced as more green infrastructure is incorporated into the scheme design on a plot-by-plot basis.”

BNG at scale

Mandatory BNG is a relatively new regulatory landscape. At this scale, the approach created some initial nervousness surrounding the BNG deficit. Commercial schemes of this nature (large warehouse units) generally struggle to achieve net gains purely on-site compared to residential or solar projects, where BNG offsetting can occur more easily within the redline boundary. It was accepted from the project’s inception that a development this big would likely require off-site BNG, but would also need careful planning to deliver both on-site habitat creation and appropriate off-site BNG units.

Nick expands: “Although the BNG baseline value of the site was relatively low (90% of the baseline habitats comprised species-poor agricultural grassland), the scale of the grassland loss resulted in a large on-site BNG deficit”.

Off-site BNG (but only across the road)

While it was clear that much of the mitigation would need to take place off-site, green space will still be integrated into later phases of the development, as Nick points out: “In addition to the retained habitats, such as the Whittle Brook Wetland Habitat Corridor, when it comes to detailed design, habitats such as hedgerows, watercourses and woodland will be retained and created in the green infrastructure landscaping around the warehouses.”

For the off-site BNG, however, there’s an ideal solution just over the road. The owners of the land, Wilton Estates, also own neighbouring land and have given permission for its use for off-site BNG. This is an ideal solution. Not only will the BNG loss be lower than currently proposed, but the off-site BNG mitigation will occur within the same districts (Bury and Rochdale) as the application land, and therefore keep biodiversity net gains within the local area.

“Not only is this a benefit for BNG, it helps in terms of the protected species that are present at the application site. For example, for birds, specific habitats are being created both on-site and within neighbouring land to maintain and enhance the suitability of habitat for such species,” says Nick.

Species-specific features

Bat barns

The site currently has a small number of bat roosts, used by common bat species such as the common and soprano pipistrelle. The strategy includes building purpose-built, dedicated “bat barns” within appropriate and suitable retained habitat to provide enhanced roosting opportunities for this species group.

Whittle Brook corridor 

Towards the south of the redline boundary, there are plans for a Wetland Brook ‘corridor’, providing a minimum of 50 metres buffer space from Whittle Brook, ranging up to 120 metres wide in some areas. All of this will be enhanced with wildflowers, grassland planting, and scrub planting to complement and enhance the existing habitats.

Veteran trees

Working closely with the Greater Manchester Ecology Unit (GMEU), our arboriculturists identified veteran trees that are to be retained within the enhanced area.

“The multi-disciplinary aspect of it, having ecology, arb, and landscape all working on it, has been really beneficial. It’s been useful for us to be able to work out a strategy together and then go back to the client with a joint solution.”

Nick

Gaining confidence through expertise

From a developer and LPA perspective, there was some nervousness about the scale of the project and the potential BNG loss that it could incur. From our side, despite the scale of the project, we were confident that the BNG mitigation hierarchy was being adhered to and there was an opportunity for genuine BNG gains within retained, enhanced and created habitats.

We were able to share examples of other phased projects we had worked on that were similar in nature to Northern Gateway, which gave the councils confidence that the BNG could be achieved at this scale.

Help with allocated land is at hand

The Northern Gateway project shows how even the most ambitious commercial projects can navigate BNG requirements without impeding a development’s flexibility. By combining all three TG disciplines and collaborating with developers and LPAs, we’re able to turn a ‘worst-case scenario’ into a clear, manageable, phased development strategy that works for everyone.

The changing regulatory landscape of BNG doesn’t have to spell bad news for your development goals. Whether you’re a landowner exploring the potential of allocated land or a developer facing complex planning challenges, we help you keep the right balance between commercial and ecological progress.